GoodWe
GoodWe ESA GW125/261-ESA-LCN-G10 (125 kW / 261 kWh all-in-one storage cabinet)Item no. DLK-GOODWE-GW125261ESALCNG10
- Rated AC power
- 125 kW
- Nominal energy
- 261.25 kWh
- Phase
- Three-phase
- Ingress protection
- IP54
In stock
GoodWe
GoodWe ESA GW125/261-ESA-LCN-G10 (125 kW / 261 kWh all-in-one storage cabinet)Item no. DLK-GOODWE-GW125261ESALCNG10
In stock
In stock
In stock
In stock
In stock
In stock
In stock
In stock
| Series | Count | Ratings | Models |
|---|---|---|---|
| SAJ CHS2 / CB2 | 7 | 29.999–50 kW · 57.3–100.3 kWh · 3-phase | CHS2-29.9K-T4-XCHS2-30K-T4-X |
| GoodWe BAT-C / BAT-AC | 5 | 61.4–261.2 kWh · 275.52 – 346.56 V · 505.12 – 635.36 V | GW61.4-BAT-AC-G10 |
| GoodWe Lynx C | 3 | 369.6 – 468.6 V · 504.0 – 639.0 V · 571.2 – 724.2 V | LX C101-10 |
All-in-one cabinets (GoodWe GW125/261-ESA-LCN-G10, SAJ CHS2, Pylontech L260-OMNI) minimize field DC wiring and outdoor footprint for AC-coupled peak shaving or fast rooftop deployments. Modular battery cabinets (GoodWe BAT-AC, BAT-LC/LCD, Lynx C) suit projects needing custom PV string ratios (up to 250 kW DC on ETR-G10) or indoor IP21 plant-room placement.
Commercial sites above 100,000 kWh annual consumption in Germany are billed on their highest 15-minute average peak power (Leistungspreis). Discharging storage during short production or EV charging spikes trims annual peak demand charges and helps manage the 2,500-full-load-hour tariff threshold.
GoodWe GW125/261-ESA-LCN-G10 (VDE 4105 + 4110/4120/4130), GW50K-ET-10 (4105 + 4110/4120), and ET-G10 75–100 kW (4105 + 4110/4120) have hosted certificates on site. SAJ CHS2 holds an active ZEREZ VDE 4110 unit certificate (968/GI 2291.01/25), while GoodWe ETR-G10 holds a ZEREZ prototype confirmation valid until August 2028.
Not without prior verification. Current Pylontech L260-OMNI datasheets state partial certification in progress, no third-party grid certificates are currently hosted on site, and no ZEREZ-ID exists in the official German registry as of November 2026. Verify certification progress with Linker and the local DSO before specifying it in Germany.
Pure battery cabinets (12 SKUs) carry ADR UN 3480 (Class 9) and EU CN 2026 code 8507 60 00. Integrated all-in-one cabinets (5 SKUs) typically fall under CN 8507 60 00 by primary battery weight and value (with BTI boundary toward 8504 40 84) and transport under UN 3481 when pre-installed or UN 3480 if split.
Your question includes this page as context. You can remove it before sending.