Description

GoodWe ESA GW125/261-ESA-LCN-G10 is a commercial all-in-one storage cabinet: a 125 kW power conversion system, five liquid-cooled LFP battery packs with 261.25 kWh usable energy, battery management and energy management in one IP54 enclosure. It connects on the AC side at 400 V three-phase and runs alongside grid-tied PV inverters. This product is one cabinet; with a SEC3000C controller up to 20 cabinets operate in parallel.

Rated AC output
125 kW
Usable energy
261.25 kWh
Nominal energy
261.25 kWh
Battery voltage
676 – 936 V
Phases
3

GoodWe ESA GW125/261-ESA-LCN-G10 (125 kW / 261 kWh all-in-one storage cabinet)

  • 125 kW / 261.25 kWh in One Cabinet: Power conversion system, five LFP battery packs, battery management and energy management are built in. The cabinet connects on the AC side at 400 V three-phase.

  • Liquid-Cooled Packs in an IP54 Enclosure: The battery packs are liquid-cooled, the PCS is fan-cooled. Operating range is -25 to +55 °C, with derating from 45 °C.

  • VDE Grid-Connection Certificates as Downloads: The VDE-AR-N 4105 certificate of conformity and the unit certificate for VDE-AR-N 4110, 4120 and 4130 are available on this page.

  • Up to 20 Cabinets in Parallel: With a SEC3000C controller, up to 20 cabinets (2.5 MW / 5.22 MWh) operate together with grid-tied PV inverters.

Technical data

Battery
Cell type
LFP (LiFePO4)
Cell capacity
314 Ah
Pack nominal energy
52.25 kWh
Pack configuration
1P52S
Number of packs
5
Nominal energy
261.25 kWh
Usable energy
261.25 kWh
Nominal voltage
832 V
Operating voltage range
676 ~ 936 V
Max. continuous charge / discharge current
188 A
Max. charge / discharge current
198.5 A
Max. charge / discharge rate
0.5P
Depth of discharge
90% ~ 100% (90% recommended)
AC connection (on-grid)
Nominal output power
125 kW
Max. output power
137.5 at 400 V AC; 130.6 at 380 V AC kW
Nominal apparent power
125 kVA
Max. apparent power
137.5 at 400 V AC; 130.6 at 380 V AC kVA
Nominal output voltage
400 / 380, 3L / N / PE V
Output voltage range
340 ~ 440 / 323 ~ 418 V
Nominal grid frequency
50 / 60 Hz
Grid frequency range
47.5 ~ 52.5 / 57.5 ~ 62.5 Hz
Max. AC current
198.5 A
Nominal output current
180.4 at 400 V AC; 189.9 at 380 V AC A
Power factor
~1 (0.8 lagging to 0.8 leading)
Total harmonic distortion
<3%
Supported grid types
TN-S, TN-C, TN-C-S, TT
IT grids
No direct connection; possible through an external isolation transformer
Recommended AC cable cross-section (PE)
35 mm²
five-core outdoor copper cable
Recommended AC cable cross-section (L1/L2/L3)
70 mm²
five-core outdoor copper cable
Off-grid operation
Nominal output power
125 kW
Max. output power
137.5 at 400 V AC; 130.6 at 380 V AC kW
Switching between grid and off-grid operation
With a GoodWe STS switching cabinet (separate device, not part of this product)
Efficiency and protection
Max. PCS efficiency
98.6 %
Max. system efficiency
92.0 %
Battery reverse polarity protection
Integrated
Anti-islanding protection
Integrated
AC overcurrent protection
Integrated
AC short-circuit protection
Integrated
AC surge protection
Type II
Safety configuration
Aerosol + water-based fire suppression, explosion-proof fan + explosion-proof plates (optional)
General data
Operating temperature range
-25 ~ +55 °C
Derating temperature
45 °C
Storage temperature
-20 ~ +45 (one month); 0 ~ +35 (one year) °C
Relative humidity
10% ~ 95%
Max. operating altitude
4000 (2000 derating) m
Cooling
Pack: liquid cooling; PCS: smart fan cooling
User interface
LED, WLAN + APP
Communication protocol
Modbus TCP, Modbus RTU
Weight
2580 kg
Dimensions (W × H × D)
1050 × 2250 × 1400 mm
Noise emission
≤70 dB
Topology
Non-isolated
Ingress protection
IP54
Anti-corrosion
C4 (C5 optional)
Charge / discharge switching time
<60 ms
Standards and certificates
EU declaration of conformity
LVD 2014/35/EU, EMC 2014/30/EU, RoHS 2011/65/EU and (EU) 2015/863, Regulation (EU) 2023/1542 Articles 10, 12 and 14
Safety
EN 62477-1:2012+A11:2014+A1:2017+A12:2021
EMC
EN IEC 61000-6-1:2019, EN IEC 61000-6-2:2019, EN IEC 61000-6-3:2021, EN IEC 61000-6-4:2019
Battery safety
IEC 62619:2022 (TÜV Rheinland certificate R 50676730 0001)
Low-voltage grid connection
VDE-AR-N 4105:2018-11 (TÜV Rheinland certificate of conformity A3 50677141 0001)
Medium-, high- and extra-high-voltage grid connection
VDE-AR-N 4110, VDE-AR-N 4120, VDE-AR-N 4130 (SGS unit certificate No. 250008RECO10-CER, valid until 12 December 2030)
Generating plants on distribution networks
EN 50549-1:2019+A1, EN 50549-10:2022 (TÜV Rheinland certificate of conformity A3 50714939 0001)
Warranty
Product warranty
5 years (electronics hardware and enclosure)
Liquid-cooling unit, fire suppression system and lock cylinder
2 years; 5 years when the system is connected to SEMS+
Performance warranty (battery cells)
10 years: 70% of the usable energy of 261.25 kWh or 6000 full charge cycles, whichever comes first
Start of warranty
First installation, or 6 months after the production date, whichever is earlier

Documents

Product questions

How is the cabinet connected to the grid?

The cabinet supports TN-S, TN-C, TN-C-S, and TT grid types. It does not support direct connection to IT system grids; connection to an IT system grid can be achieved by externally equipping an isolation transformer.

What is needed for power limiting at the grid connection point and for several cabinets?

Current transformers (CTs) and meters must be configured at the grid connection point to enable the grid connection power limitation function. If power outage operations are permitted on-site, install a primary CT at the grid connection point and connect it to the GM330/primary meter. If power outage is not permitted on-site, install a secondary CT on the existing primary CT and connect it to the DTSD1352/secondary meter. When multiple energy storage systems are connected in parallel, insert a terminating resistor into the COM port of the last energy storage system.

Can the cabinet supply the site when the grid fails?

Yes. Off-grid operation is supported. When the grid fails, the PCS controls the switching cabinet to disconnect from the grid and establishes AC voltage. The system switches to off-grid operation, and PV is connected to supply power to loads; the priority for supplying power to loads is PV > Energy Storage. When the grid recovers, the PCS issues a command to close the STS On/Off-grid transfer switch, and the system returns to grid-connected operation.

What does the site need for delivery and installation?

The energy storage system can be transported to the installation site using hoisting or a forklift. When hoisting the equipment, use flexible lifting slings or straps, with a single strap load capacity of ≥5t. When transporting the equipment with a forklift, the forklift's load capacity must be ≥5t. The equipment must be installed on a concrete or other non-combustible surface base. Before installation, ensure the base is level, firm, flat, dry, and has sufficient load-bearing capacity. The base must have pre-embedded conduits or reserved cable outlet holes to facilitate equipment cabling.

Check inverter compatibility

Find an inverter for GW125/261-ESA-LCN-G10 or discuss your existing equipment with our team.