“Linker's load modeling showed we could shave commercial peak demand without an expensive transformer upgrade. The VDE 4110 compliance pack was approved on the first submission.”
The German technical and supply base for European storage projects.
Linker bridges tier-1 clean energy manufacturers with European electrical contractors and EPCs. From Barleben (Saxony-Anhalt), we provide authorised multi-brand supply, verified inverter-battery protocol mapping, and single-point warranty backing under German commercial law.
Engineering standards matched to European grid reality.
How our technical support and authorised multi-brand supply de-risk your commercial and residential installations.
| DIMENSION |
Common Field Friction
|
The Linker Delivery Standard
|
|---|---|---|
|
Protocol & Pinouts
|
Communication faults and startup delays caused by unverified firmware pairings or mismatched CAN/RS485 pinouts on site. |
✓ Documented Pinouts: RJ45 wiring diagrams and DIP switch tables provided for first-visit commissioning.
TESTED
|
|
Grid Sign-off
|
Grid registration stalled by missing unit certificates or uncertified multi-brand hardware combinations. |
✓ Unit Certificates: VDE-AR-N 4105 & 4110 unit certificates on file for utility submission.
VDE CERT
|
|
Order Fulfillment
|
Split shipments arriving days apart, causing installation site downtime, missing balance-of-plant components, or uncoordinated deliveries. |
✓ Consolidated Orders: Hybrid inverters, modular battery stacks, and matching smart meters delivered together as one consolidated order.
COMPLETE
|
|
Warranty & Support
|
Unclear warranty routes, overseas communication delays, and lack of technical assistance after delivery. |
✓ German Technical Desk: Direct technical diagnostics and warranty claim coordination under German commercial law.
SUPPORT
|
Three pillars powering our project delivery.
Combining German-based supply, certified multi-brand engineering, and a streamlined B2B trade portal.
Hardware selected for technical reliability.
We focus strictly on Tier-1 brands with verified compatibility, proven efficiency, and comprehensive European grid certifications.
3-Phase Hybrid Inverters & High-Voltage LFP Towers
Three-phase hybrid inverters paired with stackable high-voltage LFP towers (5–20 kW / 5–30 kWh). Low 160V startup voltage ensures early morning solar harvesting, while 100% asymmetric output handles heavy single-phase loads without tripping.
- Power / Capacity
- 5–20 kW / 5–30 kWh
- Backup Transfer
- < 10 ms UPS Standard
Outdoor IP55 Liquid-Cooled Storage Cabinets
All-in-one outdoor IP55 battery cabinets (30–125 kW / 60–261 kWh) with integrated HVAC and aerosol fire suppression. Placed directly on outdoor concrete pads, eliminating the expense and indoor footprint of dedicated electrical plant rooms.
- Power / Capacity
- 30–125 kW / 60–261 kWh
- Footprint
- Zero Indoor Plant Room
High-Capacity Megawatt Container BESS
High-density liquid-cooled container BESS (500 kW to 5.0+ MWh) engineered with string PCS architecture. Isolates individual rack faults to ensure maximum project uptime, backed by standardized SCADA telecontrol interfaces.
- Capacity Range
- 500 kW – 5.0+ MWh
- Architecture
- Liquid Cooled · String PCS
Trusted by European installers and EPC contractors.
From standard residential installations to high-capacity commercial BESS projects.
Frequently asked questions regarding governance, warranty, and supply.
Direct engineering and corporate answers regarding our supply authorizations, German legal liability, and how orders are supplied.
What is Linker’s authorized relationship with hardware manufacturers, and how is factory warranty validity protected?
How is legal accountability and warranty liability structured under German commercial law?
What does Linker operate from Barleben, and what happens before an order ships?
- Authorised Supply: Residential three-phase hybrid packages, commercial storage cabinets, battery modules and high-voltage control units (BPU), supplied as authorised distributor with availability confirmed per order.
- Incoming Quality Inspection: Verification of package contents, firmware versions, and enclosure integrity before dispatch.
- Engineering Review Desk: Dedicated technical support for communication pinout verification and VDE compliance pack assembly.
Who issues the grid compliance certificates, and how is acceptance guaranteed by German grid operators (VNB)?
How are commercial orders and fulfillment milestones processed for European partners?
Build your next storage project on verified infrastructure.
Order standard packages through your partner account, or discuss a commercial project with our engineering desk in Barleben.