LINKER TECHNOLOGY GMBH · GERMAN OPERATIONS & TECHNICAL HUB
Partner Portal · linker01@de-linker.com
Linker team in Barleben
LINKER INFRASTRUCTURE · GERMANY

The German technical and supply base for European storage projects.

Linker bridges tier-1 clean energy manufacturers with European electrical contractors and EPCs. From Barleben (Saxony-Anhalt), we provide authorised multi-brand supply, verified inverter-battery protocol mapping, and single-point warranty backing under German commercial law.

German Operations Based in Barleben Matched Protocols Inverter-Battery Tables Grid Compliance VDE Certificates Domestic Support German Engineering Desk
The Linker Standard

Engineering standards matched to European grid reality.

How our technical support and authorised multi-brand supply de-risk your commercial and residential installations.

DIMENSION
Common Field Friction
The Linker Delivery Standard
🔌
Protocol & Pinouts
Communication faults and startup delays caused by unverified firmware pairings or mismatched CAN/RS485 pinouts on site.
Documented Pinouts: RJ45 wiring diagrams and DIP switch tables provided for first-visit commissioning.
Lab Verified Pairing TESTED
📑
Grid Sign-off
Grid registration stalled by missing unit certificates or uncertified multi-brand hardware combinations.
Unit Certificates: VDE-AR-N 4105 & 4110 unit certificates on file for utility submission.
Einheitenzertifikat for GoodWe ET series: VDE-AR-N 4110 and 4120 VDE CERT
📦
Order Fulfillment
Split shipments arriving days apart, causing installation site downtime, missing balance-of-plant components, or uncoordinated deliveries.
Consolidated Orders: Hybrid inverters, modular battery stacks, and matching smart meters delivered together as one consolidated order.
Consolidated Pallet Delivery COMPLETE
🛡️
Warranty & Support
Unclear warranty routes, overseas communication delays, and lack of technical assistance after delivery.
German Technical Desk: Direct technical diagnostics and warranty claim coordination under German commercial law.
German Technical Desk SUPPORT
Operational Backbone

Three pillars powering our project delivery.

Combining German-based supply, certified multi-brand engineering, and a streamlined B2B trade portal.

Consolidated order dispatch from Germany 01 · GERMAN SUPPLY
01 / 03

Authorised Supply from Germany

Operating out of Barleben (Saxony-Anhalt), we supply high-voltage batteries, three-phase hybrids, and smart meters as authorised distributor for GoodWe, SAJ, Pylontech, EcoFlow and CRRC. Orders ship from Germany to installation regions across Europe, with lead times confirmed at order.

  • Availability and lead time confirmed with every order
  • Complete package fulfillment with all balance-of-plant accessories
  • EU reverse-charge invoicing for registered trade partners
Inverter battery compatibility and protocol matching 02 · ENGINEERING DESK
02 / 03

Inverter-Battery Protocol Integration

We eliminate on-site commissioning friction before hardware arrives at the jobsite. Every inverter-battery pairing is validated against factory firmware matrices, DC operating voltage windows, and communication registers.

  • Verified RJ45 pinout assignments and DIP switch address maps
  • Factory-certified firmware compatibility across GoodWe, SAJ, and Pylontech
  • Zero guesswork or speculative on-site wiring
Partner Portal and Project Review 03 · PARTNER OPERATIONS
03 / 03

Trade Partner Portal & Project Desk

Registered trade partners access trade pricing, current product availability, and EU reverse-charge invoicing. For custom C&I systems and microgrids, our technical team evaluates load profiles and confirms the BOM in writing.

  • Trade partner portal with transparent wholesale pricing
  • Technical sizing review for commercial load profiles and C-rates
  • Direct engineer contact during field commissioning and startup
1 / 3
Hardware Portfolio

Hardware selected for technical reliability.

We focus strictly on Tier-1 brands with verified compatibility, proven efficiency, and comprehensive European grid certifications.

01 · RESIDENTIAL STORAGE KITS

3-Phase Hybrid Inverters & High-Voltage LFP Towers

Three-phase hybrid inverters paired with stackable high-voltage LFP towers (5–20 kW / 5–30 kWh). Low 160V startup voltage ensures early morning solar harvesting, while 100% asymmetric output handles heavy single-phase loads without tripping.

Power / Capacity
5–20 kW / 5–30 kWh
Backup Transfer
< 10 ms UPS Standard
GoodWe ET · SAJ H2 · Pylontech Force-H2
Explore Residential Packages →
02 · COMMERCIAL & INDUSTRIAL

Outdoor IP55 Liquid-Cooled Storage Cabinets

All-in-one outdoor IP55 battery cabinets (30–125 kW / 60–261 kWh) with integrated HVAC and aerosol fire suppression. Placed directly on outdoor concrete pads, eliminating the expense and indoor footprint of dedicated electrical plant rooms.

Power / Capacity
30–125 kW / 60–261 kWh
Footprint
Zero Indoor Plant Room
Pylontech BESS · GoodWe Commercial · SAJ CH2
Explore Commercial Solutions →
03 · UTILITY & CONTAINER STORAGE

High-Capacity Megawatt Container BESS

High-density liquid-cooled container BESS (500 kW to 5.0+ MWh) engineered with string PCS architecture. Isolates individual rack faults to ensure maximum project uptime, backed by standardized SCADA telecontrol interfaces.

Capacity Range
500 kW – 5.0+ MWh
Architecture
Liquid Cooled · String PCS
Pylontech · CRRC Container BESS
Explore Utility Solutions →
Field Experience

Trusted by European installers and EPC contractors.

From standard residential installations to high-capacity commercial BESS projects.

Customer and Linker on a C&I site visit C&I PEAK SHAVING
Marcus Weber
Head of Technical Planning, Solar EPC · Munich

“Linker's load modeling showed we could shave commercial peak demand without an expensive transformer upgrade. The VDE 4110 compliance pack was approved on the first submission.”

250 kW / 500 kWh Outdoor Cabinet
Customer with Linker at a utility BESS project COMMERCIAL BESS
Stefan Hartmann
Managing Director, NordSolar Grid · Hamburg

“Having Linker's engineering desk verify equipment sizing and confirm protocol compatibility gave our project team complete confidence. Delivery to the pad went smoothly without installation site delays.”

1.2 MWh Liquid-Cooled System
Customer and Linker working through a project at the workshop MICROGRID PROJECT
Dirk van de Berg
Lead Systems Engineer, GridVolt BV · Utrecht

“Verified Modbus communication eliminated register debugging on site. Having direct access to their German technical team makes long-term project execution much simpler.”

500 kW Multi-Cabinet Setup
2 / 3
TRADE DILIGENCE & GOVERNANCE FAQ

Frequently asked questions regarding governance, warranty, and supply.

Direct engineering and corporate answers regarding our supply authorizations, German legal liability, and how orders are supplied.

What is Linker’s authorized relationship with hardware manufacturers, and how is factory warranty validity protected?
Linker operates as an authorized supply and integration partner for Tier-1 manufacturers, including GoodWe, SAJ, Pylontech, and CRRC. We only supply hardware configurations that comply strictly with the certified pairing lists on file. Every project shipment includes traceable equipment serial numbers and warranty registrations, ensuring 100% factory warranty validity under German and European law.
How is legal accountability and warranty liability structured under German commercial law?
All supply agreements are executed directly with Linker Technology GmbH (registered in Germany under HRB 33824) and are governed by the German Commercial Code (HGB) and Civil Code (BGB). Linker acts as your direct contractual warranty partner in Europe. You do not negotiate with overseas factories; Linker coordinates all technical diagnostics, warranty claims, and replacement hardware dispatch directly from Germany.
What does Linker operate from Barleben, and what happens before an order ships?
Linker Technology GmbH operates from Barleben (Steinfeldstraße 3, 39179 Barleben, Germany). Three things happen there before an order ships:
  • Authorised Supply: Residential three-phase hybrid packages, commercial storage cabinets, battery modules and high-voltage control units (BPU), supplied as authorised distributor with availability confirmed per order.
  • Incoming Quality Inspection: Verification of package contents, firmware versions, and enclosure integrity before dispatch.
  • Engineering Review Desk: Dedicated technical support for communication pinout verification and VDE compliance pack assembly.
Who issues the grid compliance certificates, and how is acceptance guaranteed by German grid operators (VNB)?
All compliance documentation consists of authentic, accredited test reports (Einheitenzertifikate and Komponenten-Zertifikate) issued by internationally recognized testing bodies (such as TÜV Rheinland, TÜV SÜD, or DNV) in accordance with VDE-AR-N 4105 (Low Voltage) and VDE-AR-N 4110 (Medium Voltage). Linker bundles the unit certificates and verified protection parameters directly with your project documentation.
How are commercial orders and fulfillment milestones processed for European partners?
Standard residential and light commercial packages are confirmed with availability and a dispatch date at order, then shipped from Germany as one consolidated delivery. For multi-megawatt container BESS and custom commercial projects, technical parameters are locked in writing with a binding bill of materials (BOM), production timeline, and scheduled European transport.

Build your next storage project on verified infrastructure.

Order standard packages through your partner account, or discuss a commercial project with our engineering desk in Barleben.