Search the site

HOME / PRODUCTS / COMMERCIAL STORAGE / ALL-IN-ONE SYSTEMS
INTEGRATED C&I CABINETS · 30–125 KW / 57–261 KWH

All-in-One Systems

Deploy pre-wired outdoor commercial storage cabinets combining power conversion, LFP battery packs, thermal management, and fire protection in one footprint across five active GoodWe, SAJ, and Pylontech SKUs. For DC-coupled rooftop projects from 57.3 to 100.3 kWh nominal (51.5–90.2 kWh usable), SAJ CHS2 integrates 4–6 MPPT channels up to 100 kWp PV with 29.999, 30, or 50 kW AC output and supports 2–10 parallel cabinets via eManager-C1 Pro.

For high-capacity AC-coupled peak shaving and industrial load shifting, GoodWe GW125/261-ESA-LCN-G10 pairs a 125 kW PCS (137.5 kVA max) with 261.25 kWh liquid-cooled LFP storage, full VDE-AR-N 4105/4110/4120/4130 and IEC 62619 certificates on site, and parallel operation of up to 20 cabinets (2.5 MW / 5.22 MWh). Pylontech L260-OMNI offers 125 kW / 260 kWh liquid-cooled IP55 storage up to six parallel cabinets, with certification status transparently documented per project.

Key technical span

3 C&I cabinet platforms
5 SKUs
Integrated 3-phase PCS
29.999–125 kW
Nominal LFP cabinet band
57.3–261 kWh
Parallel cabinet expansion
Up to 8×

1-3 / 3 product families
SAJ CHS2-50K-T6-X

SAJ

SAJ CHS2-50K-T6-X

Item no. DLK-SAJ-CHS250KT6X

Selected model 50 kW · CHS2-50K-T6-X All models
Rated AC power
50 kW
Nominal energy
57.3–100.3 kWh
Phase
3+N+PE, 380/400
Ingress protection
IP55, IP66 (inverter)

In stock

Compare model series

SeriesCountRatingsModels
SAJ CHS2 / CB2729.999–50 kW · 57.3–100.3 kWh · 3-phaseCHS2-29.9K-T4-XCHS2-30K-T4-X

Planning & Commissioning Guides

All-in-One Systems

Buyer Q&A

What separates SAJ CHS2-29.9K-T4-X from CHS2-30K-T4-X in German grid filings?

CHS2-29.9K-T4-X caps apparent output at 29.999 kVA and 43.3 A at 400 V, keeping a single cabinet inside Germany's 30 kVA internal NS-protection limit and 44 A direct-metering ceiling. CHS2-30K-T4-X reaches 33.0 kVA maximum apparent power and 47.9 A, triggering external zNAS and transformer metering.

Why does GoodWe GW125/261-ESA-LCN-G10 carry both VDE-AR-N 4105 and 4110/4120/4130 certificates?

The PCS is rated at 125 kW (180.4 A). At 400 V, GoodWe also specifies 137.5 kW maximum active power and 137.5 kVA maximum apparent power. For a German project, the connection voltage, total installed active power and agreed export limit determine the required grid documents. The hosted unit certificates cover VDE-AR-N 4105 and 4110/4120/4130.

How many SAJ CHS2 cabinets can run in parallel and what controller is required?

SAJ CHS2 supports 2 to 10 parallel cabinets managed by the wall-mounted IP65 SAJ eManager-C1 Pro controller (300 × 400 × 170 mm, 7.5 kg). Note that paralleling three CHS2-50K-T6-X units reaches 150 kW and enters VDE-AR-N 4110 territory, for which SAJ holds active ZEREZ certificate 968/GI 2291.01/25.

What is the verified weight basis for SAJ CHS2 cabinets across battery sizes?

Per the SAJ CHS2 30–50K EU datasheet, net system weights are 1,035 kg (57.3 kWh), 1,145 kg (71.6 kWh), 1,255 kg (85.9 kWh), and 1,365 kg (100.3 kWh) in a 1,980 × 988 × 1,065 mm cabinet (user manual V0.2 lists 1,050–1,350 kg and 1,218 mm total depth including external unit).

Is Pylontech L260-OMNI cleared for ZEREZ-based German grid registration today?

No. While L260-OMNI provides 125 kW / 260 kWh liquid-cooled storage with aerosol fire suppression and 6-unit parallel capability, its datasheets list partial certifications in progress and no ZEREZ-ID is registered yet. Confirm DSO acceptance and certification status before committing it to German grid projects.

CONTACT LINKER

Not sure which model to look for?

Your question includes this page as context. You can remove it before sending.