Search the site

HOME / PRODUCTS / ACCESSORIES / BACKUP POWER
THREE-PHASE STS & ATS BACKUP BOXES · 30–125 KW

Backup Power

Engineer three-phase 400 V (3L/N/PE) grid-outage backup switching across residential whole-home boards and commercial critical loads with four IP54 static and automatic transfer cabinets from GoodWe and SAJ. GoodWe GW30K-STS-G10 (30 kW / 43.5 A rated, 63 A max, 12.5 kg) and GW60K-STS-G10 (60 kW / 100 A bypass, 15 kg) both switch in ≤ 4 ms via natural convection; crucially, GW60K-STS-G10 limits its inverter input port to 30 kW / 63 A for a single ≤ 30 kW ETA-G20 inverter.

For commercial 75–125 kW systems, GoodWe GW125K-STS-G10 handles 125 kW / 137.5 kVA / 210 A across all four ports with hosted TÜV Rheinland CE LVD certification and conservative < 10 ms table switchover (4 ms in page-1 highlights). SAJ ATS1-T63-A provides 63 A three-phase motor-driven transfer at 50 ms for H2, HS2, and HS3 installations under EU CN 8537 10 98.

Key technical span

GoodWe STS & SAJ ATS
4 SKUs
3L/N/PE transfer ratings
30–125 kW
GoodWe static transfer
≤ 4 ms / < 10 ms
SAJ ATS1-T63-A (63 A)
50 ms Motor

1-4 / 4 product families

Compare model series

SeriesCountRatingsModels
GoodWe GW30K-STS-G10 / GW60K-STS-G10230–60 kW · 3-phaseGW30K-STS-G10

Planning & Commissioning Guides

Backup Power

Buyer Q&A

Can GoodWe GW60K-STS-G10 connect a 50 kW or 60 kW hybrid inverter?

No. Per page 2 of the GoodWe STS 30–60 kW datasheet, the inverter-side port of GW60K-STS-G10 is strictly capped at 30 kW / 63 A and supports a single ≤ 30 kW ETA-G20 inverter. Its 60 kW / 100 A rating applies to grid, backup, and smart-load bypass capacity.

Why is GoodWe GW125K-STS-G10 switchover listed conservatively as < 10 ms?

The official GoodWe STS-125kW datasheet cites 4 ms in page-1 highlights and < 10 ms in the page-2 technical specification table. Specifying < 10 ms protects critical-load engineering margins while noting the manufacturer's internal datasheet variance.

Is SAJ ATS1-T63-A suitable for seamless UPS-grade IT server backup?

No. SAJ ATS1-T63-A uses motor-driven mechanical switching with a 50 ms transfer time across its 63 A three-phase ports. Sensitive IT servers or medical equipment requiring sub-10 ms continuity need a dedicated inline UPS behind the backup circuit.

Which electrical certificates are currently hosted for these four transfer cabinets?

GoodWe GW125K-STS-G10 holds a hosted TÜV Rheinland CE LVD certificate (AN 50703461 0001), and SAJ ATS1-T63-A holds a hosted manufacturer EU Declaration of Conformity referencing EN IEC 61439-1:2021. GoodWe GW30K-STS-G10 and GW60K-STS-G10 reference IEC/EN 61439-1/-2 in datasheets with no separate certificate PDF hosted yet.

CONTACT LINKER

Not sure which model to look for?

Your question includes this page as context. You can remove it before sending.