SAJ CB2-57.3-HV5 (57.3 kWh C&I battery cabinet)
SAJ CB2-57.3-HV5 is the 57.3 kWh step of the CB2 battery cabinet used by the CHS2 commercial storage line: 4 LiFePO4 modules and one control module in a closed, air-conditioned IP55 cabinet, rated 51.5 kWh usable at 28.6 kW.
- 57.3 kWh rated and 51.5 kWh usable for the whole cabinet — SAJ's own figure, not a per-module number multiplied up.
- 4 x CBU2-14.33-HV5 LFP modules plus a CBC2-HV5 control module, installed and closed at the factory.
- Integrated air conditioner and IP55 enclosure, ground-mounted, -30 to +50 °C and up to 2000 m.
- 280 Ah cells at 150 A maximum charge and discharge current, CAN to the inverter or EMS.
- Manufacturer
- SAJ
- Model code
- CB2-57.3-HV5
- Item no.
- DLK-SAJ-CB2573HV5
- Delivery
- Germany delivery estimate: EUR 205–355 · The final delivery charge is included in your Proforma.
Plan with CB2-57.3-HV5
New system, extension or replacement? Linker Advisor starts from this article and asks only for what is still open — existing model, quantity, postcode, installation date.
Figures transcribed from the manufacturer datasheet on file. Confirm your grid code and configuration with our engineers before ordering.
- GoodWe · SAJ · Pylontech · EcoFlow · Chint paired from the maker’s own lists
- Datasheets on file for every item
- Within 24 h engineering response
- MOQ 1 unit · EU delivery
- Engineering-checked configurations
Numbers that survive the bank's site audit.
Every figure below comes from the manufacturer datasheet on file — the same document your lender's technical advisor will request.
Rated energy (kWh)
Usable energy (kWh)
Rated power (kW)
Number of battery modules
Specifications
Every value exactly as published in the official CB2-57.3-HV5 documentation.
Documents
Complete the system
Balance-of-system and accessories paired with this model. Every pairing follows the manufacturer's official compatibility list.

SAJ eManager-C1 Pro communication box
- [1]SAJ eManager-C1 Pro communication box
Pick the rating
SAJ CHS2 / CB2 family. Same engineering, different size.
Every figure comes straight from the manufacturer's official datasheet.
Configuration 2
One ground-mounted battery cabinet, populated and closed at the factory.
- 4 x CBU2-14.33-HV5 LFP battery modules, 14.33 kWh each, 115 kg each.
- 1 x CBC2-HV5 control module, 28 kg.
- Enclosure: 1980 x 988 x 1065 mm, IP55, air-conditioner cooled, 960 kg complete.
- Rated 57.3 kWh, 51.5 kWh usable — SAJ publishes the usable figure for the whole cabinet, not per module.
CHS2 is the same cabinet with the inverter built in; CB2 is the battery side on its own.
- CHS2-29.9K-T4-X, CHS2-30K-T4-X, CHS2-50K-T6-X each contain a CH2 inverter (76 kg, 630 x 630 x 290 mm) plus one of these four CB2 cabinets.
- Same footprint: 1980 x 988 x 1065 mm either way — the CHS2 weight is the CB2 weight plus the inverter section.
- Order CB2 on its own when the inverter side is already specified, or to fix the storage capacity independently of the inverter rating.
Installation & wiring 2
SAJ publishes CB2 inside the CHS2 system document, alongside the CH2 inverter models CH2-29.9K-T4, CH2-30K-T4 and CH2-50K-T6.
- Cabinet ratings: 57.3 kWh at 28.6 kW, 150 A maximum charge and discharge current.
- Battery bus: the CHS2 inverter side accepts 180 to 800 V; this cabinet sits inside that window.
- Confirm the pairing on the quote. The datasheet publishes the cabinet's own ratings; which inverter and how many cabinets a site takes is set by the project, so we check it against your single-line before shipping.
Outdoors or in a plant room, on a prepared slab.
- IP55, ground-mounted, with an integrated air conditioner rather than forced-air cooling.
- -30 to +50 °C ambient, 5 to 95 percent relative humidity non-condensing, up to 2000 m altitude.
- 960 kg — the slab, access route and lifting plan need to carry it; we include the cabinet drawing with the quote.
Availability & compliance 1
One cabinet, one pallet position, freight rather than parcel.
- ADR: lithium cells ship under dangerous-goods rules; the freight quote reflects that.
- Arrives populated: modules and control module are installed at the factory, so site work is placement, DC and communications termination.
- Lead time is confirmed after order — we do not publish a stock figure we cannot stand behind.
Send the project. Hear from an engineer within 24 hours.
Loads, tariff, site constraints - our engineers reply with a compatibility check and a sizing recommendation.
Contact project supportOr write to linker01@de-linker.com — attach your load profile if you have one.