Description
The GW25K-ETA-G20 is the 25 kW three-phase ESA G20 power module: 25 kVA rated backup, 50 kW PV on 4 MPPT trackers (21/21/42/42 A), 27.5 kVA continuous off-grid and 45.0 kVA for 10 s.
- Rated AC output
- 25 kW
- Max PV input
- 50 kWp
- MPPT
- 4
- Battery voltage
- 700–950 V
- Matched batteries
- 6
GoodWe ESA GW25K-ETA-G20 (25 kW three-phase power module)
25 kVA rated backup; 27.5 kVA continuous and 45.0 kVA for 10 s off-grid; 80 A internal bypass.
50 kW maximum PV input on 4 MPPTs (21/21/42/42 A).
Battery window 700–950 V; charge 25.0 kW at 33.3 A, discharge 27.5 kW at 36.7 A.
IP66, Smart Fan Cooling, 38 kg, 800 × 340 × 270 mm.
25 kVA rated backup on a 80 A bypass path.
Internal 80 A passthrough. Rated backup 25 kVA. Off-grid 27.5 kVA continuous, 45.0 kVA for 10 s. Switching under 4 ms. IP66, wall or floor mounted, −35 to +60 °C.
27.5 kW maximum battery discharge at 36.7 A
One high-voltage battery input. Charge 25.0 kW at 33.3 A, discharge 27.5 kW at 36.7 A, 700–950 V, nominal 750 V, start-up 720 V. Battery-to-AC efficiency 98.0%.
50 kW PV input across 4 MPPTs
4 MPPTs, strings 1/1/2/2, 21/21/42/42 A / 26/26/52/52 A Isc. Max PV 50 kW, MPPT window 120–950 V, start-up 150 V, max 1000 V.
Technical data
AC output and backup
- Rated / max. power
- 25 kW
- Rated current at 400 V
- 36.3 A37.9 A at 380 V; 3L/N/PE, 220/380 V or 230/400 V, 50/60 Hz
- Max. apparent power from grid
- 55.2 kVA80 A internal bypass
- Backup rated apparent power
- 25 kVA
- Backup max. apparent power (off-grid)
- 27.5 (45.0, 10 s) kVAon-grid backup uses the from-grid rating
- On/off-grid switching time
- <4 ms
- Power factor / THDi
- 0.8 leading … 0.8 lagging / THDi <3%
PV input
- Max. PV input power
- 50 kW
- Max. input voltage
- 1000 Vstandby between 950 V and 1000 V
- MPPT operating voltage range
- 120 ~ 950 Vat nominal power 400~850 V
- Start-up voltage
- 150 V
- Number of MPPTs / strings
- 4 / 1/1/2/2
- Max. MPPT current / short-circuit current
- 21/21/42/42 / 26/26/52/52 A
Battery port
- Battery type / voltage window
- LFP (LiFePO4); 700 ~ 950 Vnominal 750 V, start-up 720 V; one battery input
- Max. charge / discharge power
- 25.0 / 27.5 kW
- Max. continuous charge / discharge current
- 33.3 / 36.7 A
Efficiency
- Max. efficiency
- 98.2 %
- European efficiency
- 97.4 %
- Max. battery-to-AC efficiency
- 98.0 %
General
- Dimensions (W × H × D)
- 800 × 340 × 270 mm
- Weight
- 38 kg
- Ingress protection
- IP66
- Operating temperature
- -35 ~ +60 °C
- Cooling
- Smart Fan Cooling
- Noise (manual)
- ≤45 dB
Documents

Product questions
What backup rating does GW25K-ETA-G20 have?
The GW25K-ETA-G20 is listed with a rated apparent power of 25 kVA on the AC side (back-up port).
How many MPPTs does GW25K-ETA-G20 have?
The GW25K-ETA-G20 has 4 MPPTs.
Which battery modules stack with this power module?
The battery system models are GW5.1-BAT-D-G20, GW5.1-BAT-D-G21, GW8.3-BAT-D-G20, GW8.3-BAT-D-G21, GW6.0-BAT-D-G20 and GW9.0-BAT-D-G20. Battery modules of different models can be mixed.
Compatibility records
| Compatible model | Category | Rating | Status & required accessory |
|---|---|---|---|
| GoodWe GW5.1-BAT-D-G20 (ESA battery module, 5.12 kWh)Item number DLK-GOODWE-GW51BATDG20 | Home Storage | 5.12 kWh | Released [1] [2] |
| GoodWe GW5.1-BAT-D-G21 (ESA battery module, 5.12 kWh)Item number DLK-GOODWE-GW51BATDG21 | Home Storage | 5.12 kWh | Released [1] [2] |
| GoodWe GW6.0-BAT-D-G20 (ESA battery module, 6.0 kWh)Item number DLK-GOODWE-GW60BATDG20 | Home Storage | 6 kWh | Released [1] [2] |
| GoodWe GW8.3-BAT-D-G20 (ESA battery module, 8.32 kWh)Item number DLK-GOODWE-GW83BATDG20 | Home Storage | 8.32 kWh | Released [1] [2] |
| GoodWe GW8.3-BAT-D-G21 (ESA battery module, 8.32 kWh)Item number DLK-GOODWE-GW83BATDG21 | Home Storage | 8.32 kWh | Released [1] [2] |
| GoodWe GW9.0-BAT-D-G20 (ESA battery module, 9.0 kWh)Item number DLK-GOODWE-GW90BATDG20 | Home Storage | 9 kWh | Released [1] [2] |
- The GoodWe ESA datasheet lists GW6.0-BAT-D-G20 and GW9.0-BAT-D-G20 modules and prints scalability of 12 pcs (p. 3). The user manual limits one column to six batteries and names a battery expansion kit for higher capacity or a lower column (p. 79).
- The GoodWe ESA datasheet lists GW5.1-BAT-D-G20, GW8.3-BAT-D-G20, GW5.1-BAT-D-G21, GW8.3-BAT-D-G21, GW6.0-BAT-D-G20 and GW9.0-BAT-D-G20 modules and prints scalability of 12 pcs (p. 3). The user manual limits one column to six batteries. For capacity expansion, including installations that require a lower stack per column, it refers to a battery expansion kit (printed p. 79; PDF p. 80).
Compare models in this series
| Model | Rated AC output | Max PV input | Phases | MPPT | Battery voltage | Matched batteries | Grid standard | Protection | System capacity range | AC limit |
|---|---|---|---|---|---|---|---|---|---|---|
| GW5K-ETA-G20 | 5 kW | 10 kWp | 3 | 3 | 700–950 V | 6 | EN 50549 | — | — | — |
| GW6K-ETA-G20 | 6 kW | 12 kWp | 3 | 3 | 700–950 V | 6 | EN 50549 | — | — | — |
| GW8K-ETA-G20 | 8 kW | 16 kWp | 3 | 3 | 700–950 V | 6 | EN 50549 | IP66 | 5–108 kWh | — |
| GW9.999K-ETA-G20 | 9.999 kW | 20 kWp | 3 | 4 | 700–950 V | 6 | — | — | — | 9.999 kVA maximum |
| GW10K-ETA-G20 | 10 kW | 20 kWp | 3 | 4 | 700–950 V | 6 | — | IP66 | 5–108 kWh | 10 kVA maximum |
| GW12K-ETA-G20 | 12 kW | 24 kWp | 3 | 4 | 700–950 V | 6 | EN 50549 | IP66 | 5–108 kWh | — |
| GW15K-ETA-G20 | 15 kW | 30 kWp | 3 | 4 | 700–950 V | 6 | EN 50549 | IP66 | 5–108 kWh | — |
| GW20K-ETA-G20 | 20 kW | 40 kWp | 3 | 4 | 700–950 V | 6 | EN 50549 | — | — | — |
| GW25K-ETA-G20 | 25 kW | 50 kWp | 3 | 4 | 700–950 V | 6 | EN 50549 | — | — | — |
| GW29.999K-ETA-G20 | 29.999 kW | 60 kWp | 3 | 4 | 700–950 V | 6 | — | — | — | 29.999 kVA maximum |
| GW30K-ETA-G20 | 30 kW | 60 kWp | 3 | 4 | 700–950 V | 6 | — | — | — | 30 kVA maximum |
Planning & Commissioning Guides
- System DesignHybrid Inverter vs. AC-Coupled Storage: A 4-Step Selection Guide for New Solar Builds and Retrofits
- Battery StorageEcoFlow, GoodWe, SAJ, and Pylontech: Four Diverging Storage Routes Reshaping Europe’s Solar Ecosystem (2026)
- Battery StorageHow to Size Battery Storage for Residential Backup: A 4-Step Guide to Critical Loads, Surge Power, Usable kWh, and Transfer Switches