SAJ H2-30K-T3-DE is a 29.99 kW German-certified commercial three-phase hybrid inverter with 60 kWp solar intake and 3 MPPTs, factory-capped at 29,999 VA to bypass mandatory central NA-Schutz relay requirements under VDE-AR-N 4105.
Sits strictly beneath 30 kVA thresholds, eliminating expensive external central grid protection switchgear.
Absorbs large commercial arrays into building consumption and high-voltage storage.
Eliminates string mismatch across 3 distinct warehouse roof pitches, accepting 6 strings of high-power bifacial modules.
Dynamically diverts power to heavily loaded single-phase commercial equipment without drawing grid electricity.
In Germany, exceeding 30.0 kVA triggers a mandatory requirement for external central grid protection relays (*Zentraler NA-Schutz*), adding €3,000. €5,000 in hardware and inspection delays. The H2-30K-T3-DE is factory-certified at 29,999 VA, allowing maximum allowable solar generation while remaining fully exempt.
SAJ
Scroll sideways to compare every model.

Featuring a heavy-duty 50 A battery interface (180–800 V) and 100% phase-unbalanced capability, the inverter charges storage rapidly while eliminating grid import penalties on asymmetric loads. 50 A charge/discharge throughput tops off 25–50 kWh battery stacks faster during brief midday solar peaks. Dynamically shifts up to 100% of capacity onto a single heavily loaded phase to prevent utility grid purchases. IP65 cast-aluminum casing allows clean indoor utility mounting or outdoor sheltered installation (-40 to +60 °C).
150% oversizing uses the same family roof cap. Extra AC does not buy a larger array than the 25K already allows
30 kVA continuous and 45 kVA for three seconds, with UPS switchover in 20 ms or less on the same dual-port B2 interface
Maximizing commercial solar generation while eliminating grid approval hurdles and equipment costs.
Tailored specifically for the German commercial market (VDE-AR-N 4105), the H2-30K-T3-DE locks AC output at exactly 29,999 W / 29,999 VA. This precision limit keeps commercial installations beneath the 30 kVA threshold requiring central grid protection (*Zentraler NA-Schutz*), while still absorbing up to 60,000 Wp of rooftop solar across 3 high-current MPPT channels.
Project fit
Scenarios that show which projects the SAJ H2-30K-T3-DE belongs in, what to verify before quoting, and when another model is the better pick.

Commercial workshops, agricultural barns, and logistics offices in Germany subject to VDE-AR-N 4105 low-voltage connection rules.
When a roof accommodates 40–60 kWp, installing a standard 30 kW+ inverter legally mandates an external central NA-Schutz relay cabinet. The H2-30K-T3-DE delivers maximum allowable feed-in (29,999 VA), accepts up to 60 kWp solar array, but saves thousands of euros in switchgear and weeks of grid approval delays.
To stay strictly under the 30.0 kVA German NA-Schutz threshold. Under German grid code VDE-AR-N 4105, systems with total generation capacity $>30.0\text{ kVA}$ must install an external central grid and plant protection unit (*Zentraler NA-Schutz*). Capping the unit at exactly 29,999 W / 29,999 VA guarantees full exemption from external protection relays.
Surplus power above 29.99 kW is routed directly into battery storage. When solar generation peaks at 45–60 kW at midday, the inverter exports its maximum allowed 29.99 kW to the building loads and grid, while simultaneously channeling the remaining 15–30 kW of DC power directly into connected high-voltage battery storage via its 50 A battery port.
SAJ B2 HV battery system (BC2-HV1 control unit + BU2-5.0-HV1/HV5 modules, 5.0–25.0 kWh stackable)
Item number: DLK-SAJ-B2100HV1
SAJ's H2/HS2/HS3/AS2/AS3 Configuration Instructions V1.0, Section 2, names 'H2 series storage inverter and BU2 series battery; or BC2 series battery control unit' as the required device set for H2
Chint DTSU666 three-phase meter
Item number: DLK-CHINT-DTSU666
Same DTSU666 model SAJ specifies in its own accessories catalogue (saj_smart_meters_dtsu666_en.pdf) for smart-meter/CT integration on three-phase systems
SAJ ATS1-T63-A automatic transfer switch (three-phase, 63A)
Item number: DLK-SAJ-ATS1T63A
ATS1's own datasheet compatible-inverter row lists H2-15/20/25/30K-T3 by name
SAJ B2-10.0-HV1Item number DLK-SAJ-B2100HV1B2-5.0-HV1 to B2-25.0-HV1 and B2-5.0-HV5 to B2-25.0-HV5, through the BC2-HV1 control module. SAJ's Configuration Instructions V1.0 state the system as H2 plus BC2 plus BU2. CAVEAT: the signed statement is SAJ's Oceania issue and names the -AU model variants. Ask SAJ to confirm the EU and DE variants in writing before a first order.
SAJ B2-10.0-HV5Item number DLK-SAJ-B2100HV5B2-5.0-HV1 to B2-25.0-HV1 and B2-5.0-HV5 to B2-25.0-HV5, through the BC2-HV1 control module. SAJ's Configuration Instructions V1.0 state the system as H2 plus BC2 plus BU2. CAVEAT: the signed statement is SAJ's Oceania issue and names the -AU model variants. Ask SAJ to confirm the EU and DE variants in writing before a first order.
SAJ B2-15.0-HV1Item number DLK-SAJ-B2150HV1B2-5.0-HV1 to B2-25.0-HV1 and B2-5.0-HV5 to B2-25.0-HV5, through the BC2-HV1 control module. SAJ's Configuration Instructions V1.0 state the system as H2 plus BC2 plus BU2. CAVEAT: the signed statement is SAJ's Oceania issue and names the -AU model variants. Ask SAJ to confirm the EU and DE variants in writing before a first order.
SAJ B2-15.0-HV5Item number DLK-SAJ-B2150HV5B2-5.0-HV1 to B2-25.0-HV1 and B2-5.0-HV5 to B2-25.0-HV5, through the BC2-HV1 control module. SAJ's Configuration Instructions V1.0 state the system as H2 plus BC2 plus BU2. CAVEAT: the signed statement is SAJ's Oceania issue and names the -AU model variants. Ask SAJ to confirm the EU and DE variants in writing before a first order.
SAJ B2-20.0-HV1Item number DLK-SAJ-B2200HV1B2-5.0-HV1 to B2-25.0-HV1 and B2-5.0-HV5 to B2-25.0-HV5, through the BC2-HV1 control module. SAJ's Configuration Instructions V1.0 state the system as H2 plus BC2 plus BU2. CAVEAT: the signed statement is SAJ's Oceania issue and names the -AU model variants. Ask SAJ to confirm the EU and DE variants in writing before a first order.
SAJ B2-20.0-HV5Item number DLK-SAJ-B2200HV5B2-5.0-HV1 to B2-25.0-HV1 and B2-5.0-HV5 to B2-25.0-HV5, through the BC2-HV1 control module. SAJ's Configuration Instructions V1.0 state the system as H2 plus BC2 plus BU2. CAVEAT: the signed statement is SAJ's Oceania issue and names the -AU model variants. Ask SAJ to confirm the EU and DE variants in writing before a first order.
SAJ B2-25.0-HV1Item number DLK-SAJ-B2250HV1B2-5.0-HV1 to B2-25.0-HV1 and B2-5.0-HV5 to B2-25.0-HV5, through the BC2-HV1 control module. SAJ's Configuration Instructions V1.0 state the system as H2 plus BC2 plus BU2. CAVEAT: the signed statement is SAJ's Oceania issue and names the -AU model variants. Ask SAJ to confirm the EU and DE variants in writing before a first order.
SAJ B2-25.0-HV5Item number DLK-SAJ-B2250HV5B2-5.0-HV1 to B2-25.0-HV1 and B2-5.0-HV5 to B2-25.0-HV5, through the BC2-HV1 control module. SAJ's Configuration Instructions V1.0 state the system as H2 plus BC2 plus BU2. CAVEAT: the signed statement is SAJ's Oceania issue and names the -AU model variants. Ask SAJ to confirm the EU and DE variants in writing before a first order.
SAJ B2-5.0-HV1Item number DLK-SAJ-B250HV1B2-5.0-HV1 to B2-25.0-HV1 and B2-5.0-HV5 to B2-25.0-HV5, through the BC2-HV1 control module. SAJ's Configuration Instructions V1.0 state the system as H2 plus BC2 plus BU2. CAVEAT: the signed statement is SAJ's Oceania issue and names the -AU model variants. Ask SAJ to confirm the EU and DE variants in writing before a first order.
SAJ B2-5.0-HV5Item number DLK-SAJ-B250HV5B2-5.0-HV1 to B2-25.0-HV1 and B2-5.0-HV5 to B2-25.0-HV5, through the BC2-HV1 control module. SAJ's Configuration Instructions V1.0 state the system as H2 plus BC2 plus BU2. CAVEAT: the signed statement is SAJ's Oceania issue and names the -AU model variants. Ask SAJ to confirm the EU and DE variants in writing before a first order.
SAJ BC2-HV1Item number DLK-SAJ-BC2HV1B2-5.0-HV1 to B2-25.0-HV1 and B2-5.0-HV5 to B2-25.0-HV5, through the BC2-HV1 control module. SAJ's Configuration Instructions V1.0 state the system as H2 plus BC2 plus BU2. CAVEAT: the signed statement is SAJ's Oceania issue and names the -AU model variants. Ask SAJ to confirm the EU and DE variants in writing before a first order.
SAJ BU2-5.0-HV1Item number DLK-SAJ-BU250HV1B2-5.0-HV1 to B2-25.0-HV1 and B2-5.0-HV5 to B2-25.0-HV5, through the BC2-HV1 control module. SAJ's Configuration Instructions V1.0 state the system as H2 plus BC2 plus BU2. CAVEAT: the signed statement is SAJ's Oceania issue and names the -AU model variants. Ask SAJ to confirm the EU and DE variants in writing before a first order.
SAJ BU2-5.0-HV5Item number DLK-SAJ-BU250HV5B2-5.0-HV1 to B2-25.0-HV1 and B2-5.0-HV5 to B2-25.0-HV5, through the BC2-HV1 control module. SAJ's Configuration Instructions V1.0 state the system as H2 plus BC2 plus BU2. CAVEAT: the signed statement is SAJ's Oceania issue and names the -AU model variants. Ask SAJ to confirm the EU and DE variants in writing before a first order.
SAJ CB3-HVCItem number DLK-SAJ-CB3HVCB2-5.0-HV1 to B2-25.0-HV1 and B2-5.0-HV5 to B2-25.0-HV5, through the BC2-HV1 control module. SAJ's Configuration Instructions V1.0 state the system as H2 plus BC2 plus BU2. CAVEAT: the signed statement is SAJ's Oceania issue and names the -AU model variants. Ask SAJ to confirm the EU and DE variants in writing before a first order.
SAJ CB3-L261Item number DLK-SAJ-CB3L261B2-5.0-HV1 to B2-25.0-HV1 and B2-5.0-HV5 to B2-25.0-HV5, through the BC2-HV1 control module. SAJ's Configuration Instructions V1.0 state the system as H2 plus BC2 plus BU2. CAVEAT: the signed statement is SAJ's Oceania issue and names the -AU model variants. Ask SAJ to confirm the EU and DE variants in writing before a first order.
SAJ CB3-M20Item number DLK-SAJ-CB3M20B2-5.0-HV1 to B2-25.0-HV1 and B2-5.0-HV5 to B2-25.0-HV5, through the BC2-HV1 control module. SAJ's Configuration Instructions V1.0 state the system as H2 plus BC2 plus BU2. CAVEAT: the signed statement is SAJ's Oceania issue and names the -AU model variants. Ask SAJ to confirm the EU and DE variants in writing before a first order.