Description
Three-phase 100 kW commercial string inverter (110 kW / 110 kVA max AC output, 1,100 V max DC input, 10 MPPTs with 30 A per MPPT, IP66) for large rooftop and ground-mounted PV plants. Supports 3L/N/PE and 3L/PE grid connections (TN-S, TN-C, TN-C-S, TT, IT) and holds a VDE-AR-N 4110 unit certificate.
The third image shows the optional LCD version.
- Rated AC output
- 100 kW
- Max PV input
- 150 kWp
- MPPT
- 10
- Grid standard
- EN 50549
- Phases
- 3
GoodWe GW100K-HT
Technical data
PV input
- Maximum PV input power
- 150000 WPrinted as Max. Input Power: 150 kW in the HT 100–136K User Manual (p. 53).
- Maximum input voltage
- 1100 V
- Nominal input voltage
- 600 V
- Start voltage
- 200 V
- MPPT voltage range
- 180 ~ 1000 V
- MPPT voltage range at rated output
- 500 ~ 850 V
- Number of MPPTs
- 10
- Strings per MPPT
- 2
- Maximum input current per MPPT
- 30 A
- Maximum short-circuit current per MPPT
- 45 A
- PV standby voltage range
- 1000 ~ 1100 VBetween 1,000 V and 1,100 V the inverter enters waiting mode and resumes normal operation when PV voltage returns to 180–1,000 V.
AC output
- Rated active power
- 100 kW
- Maximum active power
- 110 kW
- Rated apparent power
- 100 kVA
- Maximum apparent power
- 110 kVA
- Rated output current
- 144.3 A
- Maximum output current
- 167.0 A
- Grid connection
- 3L / N / PE or 3L / PE
- Maximum efficiency
- 98.6 %
- European efficiency
- 98.3 %
Installation and operation
- Dimensions (W × H × D)
- 1008 × 678 × 343 mm
- Weight
- 93.5 kg
- Ingress protection rating
- IP66
- Operating temperature
- -30 ~ +60 °CFull load operation up to 45 °C (EMEA Datasheet, p. 1).
- Maximum operating altitude
- 5000 mDerating above 4,000 m.
- Cooling
- Smart Fan Cooling
- Communication interfaces
- RS485, WiFi or 4G (Optional); Modbus-RTU (SunSpec Compliant)
- Night-time power consumption
- <2 W
Documents

Product questions
Which grid earthing systems and AC wiring modes does the GW100K-HT support?
The GW100K-HT supports TN-S, TN-C, TN-C-S, TT and IT grids at 400 V. The manual shows connections with and without neutral (3L/N/PE or 3L/PE). On TT grids the neutral-to-earth voltage must be below 20 V RMS. Each inverter needs its own AC circuit breaker. GoodWe recommends 200 A and, if local rules call for an external RCD, a Type A device rated at 1,000 mA or higher (manual, PDF pp. 10 and 28).
What happens if PV string open-circuit voltage on the GW100K-HT exceeds 1,000 V?
Per the user manual (pp. 25 and 53), open-circuit voltage on each MPPT must never exceed 1,100 V. When PV input voltage is between 1,000 V and 1,100 V, the GW100K-HT enters waiting mode and automatically resumes normal operation once the input voltage returns to the 180–1,000 V MPPT operating range (500–850 V MPPT range at nominal power; maximum DC input power 150 kW).
Which grid-connection documents cover the GW100K-HT?
The GW100K-HT holds a German medium-voltage VDE-AR-N 4110 unit certificate (SGS CEBEC Unit Certificate No. 2621/0136-CER, software version 04.04.04, p. 1), an NC RfG equipment certificate covering Poland’s PTPiREE/PSE implementation for types A–D (DNV Certificate No. TC-GCC-DNVGL-SE-0124-07790-1, p. 1), and an EN 50549-1 certificate.
How is grid export power limitation and plant monitoring configured on the GW100K-HT?
For a plant with several GW100K-HT inverters, the GoodWe manual shows the SEC1000 controlling export via RS485 on COM2. It separately shows the EzLogger Pro and EzLogger3000C for monitoring. For a single inverter, the optional COM4 port connects the meter for export control. The manual shows the GM3000C, and the HT 1100 V compatibility list also includes the GM330 (IoT compatibility list V18, PDF p. 7).
Can the GW100K-HT connect directly to a battery cabinet?
The GW100K-HT is a grid-tied PV string inverter. Its DC inputs accept PV strings. There is no battery connection. A storage installation needs a separate battery inverter or a hybrid inverter with a compatible battery port.
What European manufacturer warranty applies to the GW100K-HT?
GoodWe’s European inverter warranty gives the GW100K-HT five years of cover. The period starts at first installation or twelve months after production, whichever is earlier. If the installation date cannot be documented, GoodWe uses its shipment date in place of the installation date.
Check system compatibility
Check which equipment works with GW100K-HT in your project.
Compare models in this series
| Model | Rated AC output | Max PV input | Phases | MPPT | Protection | Grid standard |
|---|---|---|---|---|---|---|
| GW100K-HT | 100 kW | 150 kWp | 3 | 10 | IP66 | EN 50549 |
| GW120K-HT | 120 kW | 180 kWp | 3 | 12 | IP66 | EN 50549 |
Planning & Commissioning Guides
- System DesignHybrid Inverter vs. AC-Coupled Storage: A 4-Step Selection Guide for New Solar Builds and Retrofits
- Battery StorageEcoFlow, GoodWe, SAJ, and Pylontech: Four Diverging Storage Routes Reshaping Europe’s Solar Ecosystem (2026)
- Battery StorageHow to Size Battery Storage for Residential Backup: A 4-Step Guide to Critical Loads, Surge Power, Usable kWh, and Transfer Switches


