Description

Symmetrical 8-tracker routing for complex commercial roofs.

SAJ CH3-99.9K-T8 is a 99.9 kW commercial three-phase hybrid inverter with 8 independent MPPT trackers and 150 kWp solar intake, factory-capped at 99.9 kW (151.7 A) to streamline utility grid interconnection under 100 kW regulatory thresholds.

SAJ CH3-99.9K-T8
  • 8 Independent 32 A MPPT Trackers (16 Strings)

    Exceptional routing flexibility for sprawling industrial roofs, commercial carports, and ground mounts.

  • 99.9 kW Grid-Optimized AC Output (151.7 A)

    Sits precisely beneath 100 kW regulatory connection caps, simplifying utility grid interconnection approval.

  • 150,000 Wp Solar PV Intake (150% Oversizing)

    Pushes massive solar power directly into heavy factory loads and large-scale battery storage banks.

  • 150 A High-Voltage Battery Interface (500–900 V)

    Delivers high-speed DC charging and discharging to commercial battery banks for full facility peak shaving.

More product details

Sprawling logistics warehouses and commercial facilities with complex multi-pitch roofs suffer heavy mismatch losses if grouped on fewer trackers. The CH3-99.9K-T8 provides 8 independent 32 A MPPT trackers (Isc 40 A), optimizing 16 strings of 600W+ bifacial modules.

  • 8 symmetrical MPPT channels allow dedicated tracking for multiple warehouse pitches with zero cross-string clipping.
  • Absorbs up to 150,000 W of solar generation, routing daytime power directly into industrial loads and 150 A storage racks.
  • Wide MPPT window (500–850 V) delivers peak electrical conversion efficiency under full continuous load.

SAJ

Compare different models

Scroll sideways to compare every model.

4 models
SAJ CH3-99.9K-T8
This model

Log in for pricing

Log in for pricing
SAJ CH3-80K-T6

Log in for pricing

Log in for pricing
SAJ CH3-100K-T8

Log in for pricing

Log in for pricing
SAJ CH3-110K-T8

Log in for pricing

Log in for pricing
Rated AC power
99.9 kW
80 kW
100 kW
110 kW
Max. efficiency
≥98 %
≥98 %
≥98 %
≥98 %
Battery voltage
750-950 V
750-950 V
750-950 V
750-950 V
Ingress protection
IP66
IP66
IP66
IP66
Weight
135 kg
135 kg
135 kg
135 kg
Dimensions
1027*895*342 mm [H*W*D]
1027*895*342 mm [H*W*D]
1027*895*342 mm [H*W*D]
1027*895*342 mm [H*W*D]
View full technical data
Heavy commercial battery throughput with 99.9 kVA emergency power.

Transitioning into heavy commercial storage, the CH3-99.9K-T8 delivers 150 A continuous DC throughput across a wide 500–900 V window, allowing rapid cycling on large commercial battery containers (such as SAJ CB3-L261). Direct high-voltage pairing with SAJ CB2 and CB3 storage cabinets at up to 100 kW continuous DC power. 99.9 kVA continuous three-phase backup sustains commercial workshops and critical facility sub-panels in under 20 ms. IP65 heavy-duty cast-aluminum casing provides complete dust and high-pressure water protection (-30 to +60 °C).

CB3 is the listed battery.

CB3-L261 or CB3-M20 modules behind the CB3-HVC, 60 to 260 kWh per cluster, 200 A into 750-950 V LFP.

200 kWp of PV on a 99.9 kW hybrid.

200% oversizing puts 200 kWp on this 99.9 kW unit, so the roof can grow on this hybrid.

1500 V strings.

Longer runs than a 1000 V design, fewer DC home-runs on a commercial roof.

Technical data

Megawatt-scale commercial energy management engineered for grid-constrained industrial facilities.

8 MPPT trackers with 150 kWp solar intake and 99.9 kW continuous output.

Engineered for large commercial microgrids and grid-constrained industrial facilities, the CH3-99.9K-T8 features 8 independent MPPT trackers (16 string inputs) and 150,000 Wp solar intake. Its 99.9 kW continuous rating (151.7 A) keeps large commercial systems within standard 100 kW grid connection thresholds while unlocking 150 A high-voltage storage throughput.

Grid-Capped Power
99,900 VA
150% Solar DC Intake
150,000 Wp
High-Rate Storage Port
150 A
High String Current
32 A / MPPT
Power & Config
Type
1500 V DC C&I hybrid inverter, CH3 Series
Phase
3
Topology
Transformerless
Battery type
LFP
Rated AC power (kW)
99.9
Rated / max. output current (A @230V)
151.7 / 151.7
Solar Input
Max. PV array power (kWp @STC)
200
Max. DC voltage (V)
1500
MPPT voltage range (V)
300 ~ 1500
Rated DC voltage (V)
1050
Max. DC input current (A)
40
Max. DC short circuit current (A)
55
Number of strings per MPPT
8*2
String-level disconnector
Integrated
Battery & Charge
Battery type
LFP
Battery voltage range (V)
750 ~ 950
Max. charging / discharging current (A)
200
Backup & Grid Output
Max. apparent power (kVA)
99.9
Rated / max. output current (A @230V)
151.7 / 151.7
Rated output frequency (Hz)
50 / 60
Max. backup output power (kVA)
99.9
Peak backup apparent power
1.1 x rated continuous, 1.55 x rated for 1 s
Max. generator input power (kW)
199.8
Max. generator input current (A @230V)
303.4
Efficiency
Max. efficiency
>=98%
Euro efficiency
>=97.5%
Max. battery to AC efficiency
>=98%
Physical & Environment
Dimensions (H x W x D mm)
1027 x 895 x 342
Weight (kg)
135
Ingress protection
IP66
Cooling method
Smart air cooling
Operating temperature range
-30 C to +60 C (45 C to 50 C with derating)
Altitude (m)
3000
Warranty (year)
5 / 10

Project fit

Where this model fits.

Scenarios that show which projects the SAJ CH3-99.9K-T8 belongs in, what to verify before quoting, and when another model is the better pick.

01
Project scenario

Commercial Facilities Subject to Strict 100 kW Utility Connection Caps

Commercial Facilities Subject to Strict 100 kW Utility Connection Caps

Industrial manufacturing plants and distribution hubs where the local utility enforces a strict 100 kW maximum export ceiling.

Pre-set to 99.9 kW continuous output (151.7 A), ensuring fast DNO/utility interconnection approval while accepting 150 kWp solar and 150 A storage.

What Linker confirms with you
  • Confirm this model against the adjacent rating in the same family

Documents

SAJ CH3 and CB3 Series 75-125 kW datasheet (EN) Datasheet · PDF · EN

Product questions

What is the main difference between the CH3-99.9K-T8 and the CH3-100K-T8?

Regulatory grid certification and nominal current limit (151.7 A vs 151.9 A). * CH3-99.9K-T8: Factory-capped at 99.9 kW / 151.7 A to comply with regional 100 kW grid connection limits. * CH3-100K-T8: Standard model rated at 100.0 kW / 151.9 A (110 kVA max apparent power) for unrestricted commercial grids.

What size AC circuit breaker and cable cross-section are required?

200 A or 250 A 3-pole industrial MCCB; 70 mm² to 95 mm² copper cable. The inverter has a maximum continuous AC output current of 151.7 A per phase (at 400 V three-phase). A 3-pole 200 A or 250 A industrial circuit breaker (MCCB) is standard on the AC distribution board.

System components

Required components

SAJ CB3-HVC cluster control / BMS unit

Item number: DLK-SAJ-CB3HVC

CB3-M20's own live spec sheet: 'Control module = CB3-HVC (required, sold separately)'.

View product
Recommended components

SAJ CB3-M20 stackable module or CB3-L261 liquid-cooled cabinet (60–260 kWh per cluster)

Item number: DLK-SAJ-CB3M20

SAJ's CH3 + CB3 datasheet, verbatim: 'The battery is compatible with SAJ CH2 and CH3 series inverters,' 60 to 260 kWh per cluster.

View product

Approved pairings

SAJ B2-10.0-HV1SAJ B2-10.0-HV1Item number DLK-SAJ-B2100HV1On SAJ's compatibility list

CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.

SAJ B2-10.0-HV5SAJ B2-10.0-HV5Item number DLK-SAJ-B2100HV5On SAJ's compatibility list

CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.

SAJ B2-15.0-HV1SAJ B2-15.0-HV1Item number DLK-SAJ-B2150HV1On SAJ's compatibility list

CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.

SAJ B2-15.0-HV5SAJ B2-15.0-HV5Item number DLK-SAJ-B2150HV5On SAJ's compatibility list

CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.

SAJ B2-20.0-HV1SAJ B2-20.0-HV1Item number DLK-SAJ-B2200HV1On SAJ's compatibility list

CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.

SAJ B2-20.0-HV5SAJ B2-20.0-HV5Item number DLK-SAJ-B2200HV5On SAJ's compatibility list

CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.

SAJ B2-25.0-HV1SAJ B2-25.0-HV1Item number DLK-SAJ-B2250HV1On SAJ's compatibility list

CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.

SAJ B2-25.0-HV5SAJ B2-25.0-HV5Item number DLK-SAJ-B2250HV5On SAJ's compatibility list

CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.

SAJ B2-5.0-HV1SAJ B2-5.0-HV1Item number DLK-SAJ-B250HV1On SAJ's compatibility list

CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.

SAJ B2-5.0-HV5SAJ B2-5.0-HV5Item number DLK-SAJ-B250HV5On SAJ's compatibility list

CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.

SAJ BC2-HV1SAJ BC2-HV1Item number DLK-SAJ-BC2HV1On SAJ's compatibility list

CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.

SAJ BU2-5.0-HV1SAJ BU2-5.0-HV1Item number DLK-SAJ-BU250HV1On SAJ's compatibility list

CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.

SAJ BU2-5.0-HV5SAJ BU2-5.0-HV5Item number DLK-SAJ-BU250HV5On SAJ's compatibility list

CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.

SAJ CB3-HVCSAJ CB3-HVCItem number DLK-SAJ-CB3HVCOn SAJ's compatibility list

CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.

SAJ CB3-L261SAJ CB3-L261Item number DLK-SAJ-CB3L261On SAJ's compatibility list

CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.

SAJ CB3-M20SAJ CB3-M20Item number DLK-SAJ-CB3M20On SAJ's compatibility list

CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.

Related products