
SAJ CH3-100K-T8
Description
SAJ CH3-99.9K-T8 is a 99.9 kW commercial three-phase hybrid inverter with 8 independent MPPT trackers and 150 kWp solar intake, factory-capped at 99.9 kW (151.7 A) to streamline utility grid interconnection under 100 kW regulatory thresholds.
Exceptional routing flexibility for sprawling industrial roofs, commercial carports, and ground mounts.
Sits precisely beneath 100 kW regulatory connection caps, simplifying utility grid interconnection approval.
Pushes massive solar power directly into heavy factory loads and large-scale battery storage banks.
Delivers high-speed DC charging and discharging to commercial battery banks for full facility peak shaving.
Sprawling logistics warehouses and commercial facilities with complex multi-pitch roofs suffer heavy mismatch losses if grouped on fewer trackers. The CH3-99.9K-T8 provides 8 independent 32 A MPPT trackers (Isc 40 A), optimizing 16 strings of 600W+ bifacial modules.

SAJ
Scroll sideways to compare every model.
Transitioning into heavy commercial storage, the CH3-99.9K-T8 delivers 150 A continuous DC throughput across a wide 500–900 V window, allowing rapid cycling on large commercial battery containers (such as SAJ CB3-L261). Direct high-voltage pairing with SAJ CB2 and CB3 storage cabinets at up to 100 kW continuous DC power. 99.9 kVA continuous three-phase backup sustains commercial workshops and critical facility sub-panels in under 20 ms. IP65 heavy-duty cast-aluminum casing provides complete dust and high-pressure water protection (-30 to +60 °C).
CB3-L261 or CB3-M20 modules behind the CB3-HVC, 60 to 260 kWh per cluster, 200 A into 750-950 V LFP.
200% oversizing puts 200 kWp on this 99.9 kW unit, so the roof can grow on this hybrid.
Longer runs than a 1000 V design, fewer DC home-runs on a commercial roof.
Megawatt-scale commercial energy management engineered for grid-constrained industrial facilities.
Engineered for large commercial microgrids and grid-constrained industrial facilities, the CH3-99.9K-T8 features 8 independent MPPT trackers (16 string inputs) and 150,000 Wp solar intake. Its 99.9 kW continuous rating (151.7 A) keeps large commercial systems within standard 100 kW grid connection thresholds while unlocking 150 A high-voltage storage throughput.
Project fit
Scenarios that show which projects the SAJ CH3-99.9K-T8 belongs in, what to verify before quoting, and when another model is the better pick.

Industrial manufacturing plants and distribution hubs where the local utility enforces a strict 100 kW maximum export ceiling.
Pre-set to 99.9 kW continuous output (151.7 A), ensuring fast DNO/utility interconnection approval while accepting 150 kWp solar and 150 A storage.
Regulatory grid certification and nominal current limit (151.7 A vs 151.9 A). * CH3-99.9K-T8: Factory-capped at 99.9 kW / 151.7 A to comply with regional 100 kW grid connection limits. * CH3-100K-T8: Standard model rated at 100.0 kW / 151.9 A (110 kVA max apparent power) for unrestricted commercial grids.
200 A or 250 A 3-pole industrial MCCB; 70 mm² to 95 mm² copper cable. The inverter has a maximum continuous AC output current of 151.7 A per phase (at 400 V three-phase). A 3-pole 200 A or 250 A industrial circuit breaker (MCCB) is standard on the AC distribution board.
SAJ CB3-HVC cluster control / BMS unit
Item number: DLK-SAJ-CB3HVC
CB3-M20's own live spec sheet: 'Control module = CB3-HVC (required, sold separately)'.
SAJ CB3-M20 stackable module or CB3-L261 liquid-cooled cabinet (60–260 kWh per cluster)
Item number: DLK-SAJ-CB3M20
SAJ's CH3 + CB3 datasheet, verbatim: 'The battery is compatible with SAJ CH2 and CH3 series inverters,' 60 to 260 kWh per cluster.
SAJ B2-10.0-HV1Item number DLK-SAJ-B2100HV1CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.
SAJ B2-10.0-HV5Item number DLK-SAJ-B2100HV5CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.
SAJ B2-15.0-HV1Item number DLK-SAJ-B2150HV1CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.
SAJ B2-15.0-HV5Item number DLK-SAJ-B2150HV5CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.
SAJ B2-20.0-HV1Item number DLK-SAJ-B2200HV1CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.
SAJ B2-20.0-HV5Item number DLK-SAJ-B2200HV5CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.
SAJ B2-25.0-HV1Item number DLK-SAJ-B2250HV1CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.
SAJ B2-25.0-HV5Item number DLK-SAJ-B2250HV5CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.
SAJ B2-5.0-HV1Item number DLK-SAJ-B250HV1CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.
SAJ B2-5.0-HV5Item number DLK-SAJ-B250HV5CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.
SAJ BC2-HV1Item number DLK-SAJ-BC2HV1CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.
SAJ BU2-5.0-HV1Item number DLK-SAJ-BU250HV1CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.
SAJ BU2-5.0-HV5Item number DLK-SAJ-BU250HV5CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.
SAJ CB3-HVCItem number DLK-SAJ-CB3HVCCB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.
SAJ CB3-L261Item number DLK-SAJ-CB3L261CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.
SAJ CB3-M20Item number DLK-SAJ-CB3M20CB3-L261 and CB3-M20, through the CB3-HVC high-voltage cabinet. SAJ's CB3 datasheet states it directly: the battery is compatible with SAJ CH2 and CH3 series inverters. 60 to 260 kWh per cluster.