Solution Configurator
A project can start with the information already available. Roof drawing is optional.
How the Linker Solution Configurator works
Start with the PV capacity you know or describe the system you want to build. For an existing installation, compare keeping the inverter with replacing it. If you have a roof plan, draw the usable area and mark obstacles that cast shade. You can also work from the site figures alone.
Compare the inverter and high-voltage battery together. Open the manufacturer document to check the model, required control module and conditions for backup operation. Select a system to prepare a parts list and a PDF for your client. You can send the same selection to Linker Technology GmbH in Barleben, Germany, for a quotation.
| Project segment | Typical sizing range | Manufacturers and planning outputs |
|---|---|---|
| Residential hybrid storage | 3–30 kW inverters · 5–40 kWh storage | GoodWe and SAJ. Compare battery combinations and check the backup switch. |
| Commercial and industrial storage | 25–125 kW inverters or PCS · 60–500+ kWh storage | GoodWe, SAJ and Pylontech. Review peak demand, metering and transfer switches. |
| Utility-scale storage | Multiple cabinets · 200 kWh to MWh-scale projects | Review the site layout, power requirements and project documentation with the engineering team. |
| Grid connection and quotation | Germany, Austria, Switzerland and other European markets | Open the VDE-AR-N 4105, VDE-AR-N 4110 or EN 50549 certificate for the model. For Austria, ask for the applicable TOR Erzeuger document. |