
SAJ CH3-125K-T8
Description
SAJ CHS3 125 kW / 261 kWh is a turnkey utility-scale commercial hybrid storage station pairing the 8-MPPT CH3-125K-T8 inverter with the liquid-cooled CB3-L261 container, engineered for industrial microgrids, 187.5 kWp solar arrays, and high-rate peak shaving.
Pre-engineered communication and hardware integration between the 125 kW hybrid inverter and 261 kWh liquid-cooled battery container.
187.5 kWp Massive Solar PV Intake, 8 independent MPPT channels absorb immense rooftop generation to run heavy industrial equipment and charge storage at full 140 A speed.
Precision liquid thermal distribution maintains cell temperature uniformity within ≤2.5 °C for extended battery cycle life.
Eliminates multi-vendor compatibility risks, delivering an integrated utility-grade commercial storage station in one verified shipment.
Managing multi-megawatt commercial solar arrays across expansive factory roofs requires high string granularity. The integrated CH3-125K inverter provides 8 independent 32 A MPPT trackers (Isc 40 A), optimizing 16 strings of 600W+ bifacial modules.


Sized for heavy daily commercial cycling, the integrated CB3-L261 container houses thirteen 20 kWh liquid-cooled modules using 280 Ah prismatic LFP cells. Direct liquid cooling plates beneath cells maintain temperature variance strictly within ≤2.5 °C. 931.8 V nominal operating bus minimizes DC transmission losses and thermal stress during 140 A cycling. Multi-sensor aerosol fire suppression, combustible gas detection, and emergency pressure relief vents.
261 kWh liquid-cooled IP55 cabinet at 832 V nominal - the listed CB3 cabinet path.
Wall unit for conversion and backup switching; ground cabinet for liquid-cooled energy. Spec both pads.
Pre-engineered commercial solar-plus-storage delivering megawatt-hour scalability and industrial peak shaving.
Pre-matched for large industrial microgrids, distribution centers, and energy trading projects, this complete package pairs the CH3-125K-T8 hybrid inverter with the 261.2 kWh liquid-cooled CB3-L261 battery cabinet. It provides 125 kW continuous hybrid throughput across 8 MPPT channels, delivering industrial peak shaving and multi-megawatt-hour scalability with zero integration guesswork.
Project fit
Scenarios that show which projects the SAJ CHS3 125 kW / 261 kWh belongs in, what to verify before quoting, and when another model is the better pick.

Manufacturing facilities or fleet charging depots requiring a complete, factory-matched 125 kW / 261 kWh solar-plus-storage station.
Pre-engineered package eliminates multi-vendor compatibility risks, providing turnkey single-SKU procurement and unified commissioning.
1x SAJ CH3-125K-T8 hybrid inverter + 1x SAJ CB3-L261 liquid-cooled container (261.2 kWh). The package includes the CH3-125K-T8 125 kW commercial hybrid inverter (8 MPPTs) and the CB3-L261 outdoor liquid-cooled battery container (261.17 kWh nominal / 248.1 kWh usable), complete with internal BMS controller, liquid chiller unit, and interconnecting power/communication leads.
250 A 3-pole industrial MCCB; 95 mm² to 120 mm² copper cable. With a maximum continuous AC output current of 189.9 A per phase (at 400 V three-phase), install a 3-pole 250 A industrial circuit breaker (MCCB) on the main distribution switchboard, paired with copper conductor cross-sections of 95 mm² to 120 mm².
Chint DTSU666-CT grid meter
Item number: DLK-CHINT-DTSU666CT
Grid-connection-point measurement for export limitation and site consumption monitoring where the DSO or the EMS strategy requires it, confirm the SAJ-approved meter configuration for the CH3 when quoting.
MBS KBU 58 400/5 A split-core CT set
Item number: DLK-MBS-KBU58-400-5A
Split-core CTs for the grid-point meter on C&I incomers; pick the ratio (400/5 up to 1000/5 available) to match the site's main breaker.
SAJ eManager-C1 Pro
Item number: DLK-SAJ-EMANAGERC1PRO
SAJ's C&I energy-management controller, listed by SAJ alongside the CHS3, for plant-level EMS, monitoring and dispatch across multiple inverters and battery cabinets.
SAJ CB3-L261 battery cabinet
Item number: DLK-SAJ-CB3L261
Duration scales by adding cabinets: up to 4 × CB3-L261 per CH3 inverter, covering 2 h to 8 h storage durations at 125 kW.