Description

Non-invasive current measurement without electrical downtime.

GoodWe GMK330 is a complete commercial three-phase smart energy meter kit bundled with three pre-calibrated split-core current transformers, engineered for fast, non-invasive installation on commercial switchboards and large solar installations.

  • Turnkey Kit with 3 Matched Split-Core CTs

    Eliminates component matching guesswork, arriving complete with 3 pre-calibrated current transformers in the box.

  • Non-Invasive High-Current Installation

    Split-core CTs clamp around main commercial busbars without cutting conductors or shutting down building power.

  • Class 0.5S High Precision Metering

    Utility-grade measurement accuracy for dynamic zero-export limiting, commercial peak shaving, and sub-billing analytics.

  • Direct Integration with GoodWe SEC & ET Inverters

    High-speed RS485 Modbus telemetry ensures instantaneous closed-loop power modulation.

More product details

Installing solid-core CTs requires de-energizing the whole building and unbolting main busbar lugs. The GMK330 kit includes 3 snap-together split-core CTs that clamp around live or de-energized conductors in minutes.

  • Pre-matched CTs clamp around large cables and busbars without cutting copper conductors.
  • Measures three-phase active power, reactive power, power factor, and bidirectional energy flow.
  • Factory-calibrated secondary leads connect directly to the meter’s input terminals.

GoodWe

Compare different models

Scroll sideways to compare every model.

3 models
GoodWe GMK330
This model

Log in for pricing

Log in for pricing
GoodWe GM330

Log in for pricing

Log in for pricing
GoodWe GM3000

Log in for pricing

Log in for pricing
Accuracy class
0.5
0.5
1
Communication
RS485
RS485
RS485
Ingress protection
IP20
IP20
IP20
View full technical data
High-speed synchronization with GoodWe SEC controllers and inverters.

High-speed synchronization with GoodWe SEC controllers and inverters.

The GMK330 communicates over an isolated RS485 twisted-pair bus, delivering real-time power telemetry to GoodWe commercial inverters and SEC energy controllers. High-speed Modbus RTU protocol pre-configured for GoodWe commercial inverters and SEC controllers. Backlit LCD display shows real-time line voltages, line currents, frequency, and active power per phase. Low internal standby power draw (< 3 W) ensures minimal parasitic system losses.

Takes three 120 A split-core clamps

Three calibrated 120 A : 40 mA current transformers ship in the box, enabling fast non-invasive connection around phase conductors.

Holds Class 0.5 active precision

Delivers Class 0.5 accuracy on active energy, voltage, and current alongside Class 1 reactive energy precision.

Fits four DIN modules on the rail

The 72 x 85 x 72 mm housing weighs 240 g and clips to standard 35 mm rail, operating from minus 30 to 70 °C in IP20.

Technical data

Turnkey commercial energy telemetry engineered for rapid, non-invasive switchboard deployment.

Commercial three-phase smart meter kit bundled with 3 pre-calibrated split-core CTs.

Pre-packaged for fast commercial installation, the GMK330 bundles the GM330 meter with three matched split-core current transformers. It allows electricians to clamp around large commercial busbars without disconnecting heavy incoming service cables, instantly providing Class 0.5S high-precision 3-phase telemetry to GoodWe inverters and SEC energy controllers.

3 CTs Included
Turnkey Kit
Utility Precision
Class 0.5S
4U DIN-Rail Format
72 mm
Fast Telemetry
< 1s
Measurement
Supported grid types
1P2W / 3P3W / 3P4W
Connection
Current transformers, 3 supplied
Number of current transformers
3
Operating voltage, 3P4W (Vac)
90 ~ 264 L-N
Operating voltage, 3P3W (Vac)
90 ~ 264 L-L
Frequency (Hz)
50 / 60
Current transformer ratio
120 A : 40 mA (EMEA)
Accuracy, voltage / current
Class 0.5
Accuracy, active energy
Class 0.5
Accuracy, reactive energy
Class 1
Communication
Method
RS485
Distance (m)
1000
Physical
Ingress protection
IP20
Operating temperature (°C)
-30 ~ +70
Dimensions (W × H × D, mm)
72 × 85 × 72
Housing
4 modules
Mounting
DIN rail
Weight (g)
240
Power consumption (W)
< 5
User interface
4 LED, reset button

Project fit

Where this model fits.

Scenarios that show which projects the GoodWe GMK330 belongs in, what to verify before quoting, and when another model is the better pick.

01
Project scenario

Fast Turnkey Commercial Solar Deployments (>100 A Service)

Fast Turnkey Commercial Solar Deployments (>100 A Service)

Commercial installations deploying GoodWe ET 15–50 kW or ETC/BTC inverters where installers need a guaranteed complete meter-and-CT kit in a single box.

Arrives pre-matched with 3 split-core CTs, saving procurement time and eliminating CT ratio mismatch errors during commissioning.

What Linker confirms with you
  • Confirm this model against the adjacent rating in the same family

Documents

GoodWe GMK330 datasheet (EN) Datasheet · PDF · EN GoodWe GMK330 Datasheet Datasheet · PDF · EN

Product questions

What is the main advantage of ordering the GMK330 kit over the standalone GM330?

Guaranteed CT compatibility and single-box convenience. The GMK330 kit includes 3 pre-calibrated split-core current transformers tested specifically with the meter's internal measurement processor. This avoids ordering the wrong CT secondary ratio (5 A vs 1 A) or incompatible burden ratings.

Can the split-core CTs be clamped on without shutting down building power?

Yes. Split-core design allows non-invasive installation around insulated cables. The split-core current transformers feature a snap-open hinge mechanism that clamps directly around existing insulated cables or busbars, eliminating the need to unbolt power lugs or coordinate costly facility power shutdowns.