SAJ eManager-Promate
SAJ Energy Management

SAJ eManager-Promate

SAJ eManager-Promate is an expansion module for the SAJ eManager energy management system, adding measurement and control functions inside the SAJ ecosystem.

  • Bluetooth / 4G / Ethernet / RS485 connectivity with Web, App, or local-web access on the C1 Pro.
  • SAJ recommends the C1 Pro for CHS2 installations run 2 to 10 units in parallel.
  • IP65-rated, wall-mounted enclosure.
Manufacturer
SAJ
Model code
Pro-Mate
Item no.
DLK-SAJ-EMANAGERPROMATE
Delivery
Delivery included in your Proforma
Orderable · lead time confirmed after order

Plan with Pro-Mate

New system, extension or replacement? Linker Advisor starts from this article and asks only for what is still open — existing model, quantity, postcode, installation date.

Figures transcribed from the manufacturer datasheet on file. Confirm your grid code and configuration with our engineers before ordering.

  • GoodWe · SAJ · Pylontech · EcoFlow · Chint paired from the maker’s own lists
  • Datasheets on file for every item
  • Within 24 h engineering response
  • MOQ 1 unit Â· EU delivery
  • Engineering-checked configurations
Peak shaving is a schedule, not a hope.
Plant logic

Peak shaving is a schedule, not a hope.

One controller coordinates inverters, meters and tariff windows across the plant.

Bluetooth / 4G / Ethernet / RS485 connectivity with Web, App, or local-web access on the C1 Pro.
SAJ recommends the C1 Pro for CHS2 installations run 2 to 10 units in parallel.
IP65-rated, wall-mounted enclosure.
Documentation

Specifications

Every value exactly as published in the official Pro-Mate documentation.

Manufacturer datasheetNot published by SAJ as of 2026-07-10.
StatusSpecifications withheld.This page will not carry numbers we cannot source from SAJ.
What it isExpansion module for the SAJ eManager energy management system.
Full datasheet (PDF) Ask an engineer

Pick the rating

SAJ eManager family. Same engineering, different size.

2 ratings Same series, same engineering — your model is highlighted.
SAJ eManager-C1 Pro Sign in for pricing
SAJ eManager-Promate This model Sign in for pricing

Every figure comes straight from the manufacturer's official datasheet.

Configuration 2

Commercial and industrial PV and storage plants. SAJ recommends the C1 Pro for CHS2 installations running 2 to 10 units in parallel.

  • Role: a smart communication box, the EMS controller with optional switch and meters.
  • Fleet size: 2 to 10 parallel CHS2 cabinets per controller, per SAJ's recommendation.
  • Data interval: 1 to 30 minutes selectable, with 5 minutes as the standard setting.

The eManager-C1 EMS controller is the standard content. The Ethernet switch and the smart meters are optional line items, so state them explicitly on the order.

  • Standard: the eManager-C1 EMS controller.
  • Optional: the Ethernet switch and the smart meters.
  • Enclosure: PC box, 300 x 400 x 170 mm, 7.5 kg, IP65, wall-mounted.
  • Ordering note: name the optional switch and meters on the quote so the site kit arrives complete.

Installation & wiring 1

It accepts 9 to 36 Vdc or 176 to 300 Vac supply and draws 50 W maximum.

  • Communication: Bluetooth, 4G, Ethernet and RS485.
  • No SIM required: 4G is one of four channels; Ethernet, RS485 and Bluetooth run without a cellular contract.
  • Mounting: wall-mounted, IP65 enclosure.
  • Environment: -25 to 60 C operating range, 5 to 95% non-condensing humidity.

Operation & warranty 1

SAJ lists export limitation, demand control, peak shaving, self-use, backup power and battery limit protection as controller functions.

  • Access: Web, App or local web, so the plant is reachable both remotely and on site.
  • Data logging: collection interval selectable from 1 to 30 minutes, 5 minutes standard.
  • Firmware: updates over Ethernet, USB or remote.

Availability & compliance 1

SAJ has not published a datasheet for the eManager-Promate as of 2026-07-10. Rather than print numbers we cannot source from the manufacturer, the page carries none.

  • What it is: an expansion module for the SAJ eManager energy management system.
  • How to order: ask for the current ordering data with your quote; specifications will be added once SAJ publishes them.
  • Certificates: no certificate data is published for it either, so confirm the certificate set with the quote.
Next step

Send the project. Hear from an engineer within 24 hours.

Loads, tariff, site constraints - our engineers reply with a compatibility check and a sizing recommendation.

Contact project support

Or write to linker01@de-linker.com — attach your load profile if you have one.