
EcoFlow Smart Meter (external grid-point meter)
External grid-point energy meter for EcoFlow home storage systems.
- Grid import/export measurement for HEMS self-consumption optimisation and export limiting
- Only needed when loads sit outside the backup output — OCEAN 2's meter is otherwise built in
- Standard metering component for PowerOcean gen-1 installs without built-in metering
- Manufacturer
- EcoFlow
- Model code
- EcoFlow Smart Meter
- Item no.
- DLK-ECOFLOW-SMART-METER
- Delivery
- Delivery included in your Proforma
Plan with EcoFlow Smart Meter
New system, extension or replacement? Linker Advisor starts from this article and asks only for what is still open — existing model, quantity, postcode, installation date.
Figures transcribed from the manufacturer datasheet on file. Confirm your grid code and configuration with our engineers before ordering.
- GoodWe · SAJ · Pylontech · EcoFlow · Chint paired from the maker’s own lists
- Datasheets on file for every item
- Within 24 h engineering response
- MOQ 1 unit · EU delivery
- Engineering-checked configurations

EcoFlow Smart Meter, specified from the datasheet.
Every value on this page is transcribed from the manufacturer documentation on file.

Built-in first — external only where the topology demands it
EcoFlow promotes the built-in smart meter as an installation time-saver on OCEAN 2 (no extra wiring for external meters in the standard whole-home-backup topology); the external meter remains the measurement device for split-load installations and gen-1 PowerOcean systems.
Inspect it before you spec it.
Official renders, installation photos and system panels for this model line.

Official manufacturer product render
Specifications
Every value exactly as published in the official EcoFlow Smart Meter documentation.

Pick the rating
EcoFlow OCEAN 2 (Accessories) family. Same engineering, different size.
Every figure comes straight from the manufacturer's official datasheet.
Configuration 1
No. OCEAN 2 has a built-in grid-point smart meter; the external meter is for wiring topologies the built-in one cannot see.
- Built-in metering: EcoFlow integrates the meter in OCEAN 2 and credits it with saving over 50 minutes of installation time.
- When the external unit is needed: when part of the consumption stays outside the inverter's backup output, for example large fixed loads fed from a separate distribution.
- Gen-1 PowerOcean: gen-1 PowerOcean systems have no built-in metering, so the external meter remains the standard metering component there.
- Quick check: if every consumer circuit runs behind the backup output, the built-in meter covers whole-home measurement and you can skip this item.
Installation & wiring 1
EcoFlow defines 'Connecting Smart Meter' as its own wiring step in the official OCEAN 2 installation flow for the topologies that need it.
- Position: it is a grid-point meter, so it sits at the grid connection point where it sees the property's total import and export.
- Applicable systems: only installations with consumers outside the backup path wire in this step; all-behind-backup systems skip it.
- Planning: settle the topology before commissioning so the metering step lands in the right order during commissioning.
Operation & warranty 1
The meter gives the energy management system the full import and export picture at the grid connection point.
- Export limiting: the system needs total export at the grid point to hold a feed-in limit; loads outside the backup path would otherwise be invisible to it.
- Self-consumption optimisation: the HEMS optimises self-consumption against total grid import and export, not just the backup-side loads.
- Net effect: with the meter fitted, a partial-backup installation is fully measured for control purposes.
Availability & compliance 1
The exact meter model and part number are confirmed with the quote against the current EcoFlow accessory list.
- Model confirmation: EcoFlow revises its accessory list over time, so the quote names the exact unit supplied for your OCEAN 2 system.
- Certificates: certificate data for this accessory is not published on this page; confirm the certificate set required by your grid operator together with the quote.
- Ordering: state the intended topology, in particular which loads sit outside the backup output, so the correct accessory is quoted.
Send the project. Hear from an engineer within 24 hours.
Loads, tariff, site constraints - our engineers reply with a compatibility check and a sizing recommendation.
Contact project supportOr write to linker01@de-linker.com — attach your load profile if you have one.


